Neglected Factors When Building Enterprise Systems

1) Ease of integration in the target business, 2) vendor lock-ins, and 3) inflexibility caused by technical debt.

Andreja Dulović
Management Matters
Published in
8 min readOct 11, 2021

--

Old rusty ship on a dry land (on a grass field and some trees are behind). A neglected ship.
Image by Eveline de Bruin from Pixabay

When I look back on all the applications and systems I worked on in my career, I’d say that 90% of all long-term problems are due to these three reasons:

--

--